Buying a New-Build Home in the Netherlands (Nieuwbouw)

New-build is sold v.o.n., paid in instalments and delivered long after you sign. What that changes about your costs, your mortgage, your risks and your guarantees, with the 2027 figures.

A new-build home (nieuwbouw) is usually bought from a drawing, long before it exists. You pay no transfer tax, you get a top energy label, and nobody outbids you. In exchange you wait, often pay for two homes at once, and carry risks an existing house does not have.

The price: v.o.n. instead of k.k.

An existing home is sold kosten koper (k.k.): the buyer pays transfer tax and the notary on top of the price. New-build is sold vrij op naam (v.o.n.), "free in name": the seller carries the cost of putting the home in your name.

What a v.o.n. buyer still pays

You still pay for everything that concerns your loan rather than the transfer:

A valuation report is often not needed for a project home: the NHG rules set the value of a new-build home by adding up the contract price, the balance of options and upgrades, and the building interest. Closing Costs explains each item, and the Costs Checklist totals them.

Two contracts, paid in instalments

You sign two agreements, often combined in one document, the koop-/aannemingsovereenkomst: a purchase agreement (koopovereenkomst) for the land and a construction agreement (aannemingsovereenkomst) for building the home on it.

The land is transferred to you at the notary, where you also sign the mortgage deed. The construction price is then invoiced in instalments (termijnen) as the build progresses.

Do not pay any instalment before the land is in your name and you hold the guarantee certificate. Woningborg does not cover payments made before both.

The bouwdepot, and interest during the build

The part of your loan that is not yet due sits in a construction deposit (bouwdepot) at the lender, and each instalment is paid from it. Under the NHG rules a bouwdepot is mandatory for everything you borrow for a new-build home.

You pay interest on the full loan and receive interest on what is still in the depot. Your net cost rises with every instalment. If the lender pays less on the depot than your mortgage rate, the gap is called renteverlies. For tax, the interest you receive is subtracted from the interest you pay and only the difference is deductible, for at most two years from signing the contract. More in Hypotheekrenteaftrek.

Then there is building interest (bouwrente), owed to the developer:

Double housing costs and the mortgage offer

While the home is built you keep paying rent or your current mortgage, and from the land transfer you also pay interest on the new loan. These double costs (dubbele lasten) are the main cash strain of new-build. Before you sign, ask for the expected instalment schedule and delivery date, and add a buffer: a late build extends the period.

A mortgage offer is also valid for a limited time. The Consumentenbond puts the usual validity at two to seven months and notes that lenders may use a different period for new-build. Extending typically costs about 0.25% of the loan per month (€1,500 for three months on €200,000); some lenders charge it only when rates have risen. The mortgage calculator shows your monthly cost once the depot is empty.

Meerwerk: options and upgrades

Meerwerk is anything you order from the builder beyond the standard specification: a dormer, an extension, a better kitchen. Minderwerk is what you leave out.

Meerwerk can be financed: under the NHG rules the net of meerwerk and minderwerk counts toward the value of the home and may be included in the loan. Furnishing the home cannot. Your income still caps the total, so check the maximum mortgage tool before you tick boxes. The NHG limit (€500,000 for a binding offer in 2027) is tested against the total cost including meerwerk and building interest; see What is NHG?.

Guarantees: Woningborg, SWK and the 5% rule

A project home normally comes with a certificate from a guarantee institution such as Woningborg or SWK; NHG requires one carrying the Keurmerk GarantieWoning. It covers two risks:

At delivery (oplevering) you inspect the home with the builder and every shortcoming (opleverpunt) goes into a signed report. An independent inspector can join this opleverkeuring; the report is your evidence.

The law then gives you leverage. A private buyer may keep back the last 5% of the construction price and deposit it with the notary instead of paying the builder (the 5%-regeling); the builder may put up a bank guarantee instead. The notary releases the money three months after delivery, unless you tell the notary in time that defects remain and what amount should stay blocked. The builder must inform you in writing about this right.

Energy label and extra borrowing

New homes must meet the BENG energy requirements. According to a study for RVO, that puts a new house at label A+++ at least and possibly A++++, and most new apartments at A+++. The lending rules reward that. On top of what your income allows you may borrow (unchanged from 2026 to 2027):

For an A++++ new-build home the NHG limit is €530,000 in 2027. See Sustainable Mortgages.

Registration, lottery and conditions

You do not bid on new-build. The price is fixed, you register (inschrijving) for one or more plots, and when there are more candidates than homes the developer allocates them, often by lottery. Three protections matter before you sign:

New-build or an existing home?

New-build fits you if you can wait for the build, can carry double costs for part of that time, want low energy bills and little maintenance, and prefer a fixed price to a bidding contest.

An existing home fits better if you need to move soon, want to see what you buy, or have no room for a period of paying twice. You pay transfer tax unless the starter exemption applies, and you may have to overbid. See The Bidding Process.

Neither is cheaper by definition. A v.o.n. price already contains VAT, the transfer deed and a home that needs no renovation, so compare total cost, not sticker prices. See the first-time buyer guide for the existing-home route and the Closing Timeline for the order of the steps.

Figures are for 2027 unless stated otherwise and are indicative. Contracts and guarantee terms differ per project. This is educational information, not financial advice.